Fiber Splice Ticket Note: What to Document After a Mid-Span Splice

A fusion splice takes minutes to fire. The ticket note after it decides whether the span stays traceable. "Spliced fibers, link restored" is the note everyone writes and nobody can audit: which tray, which fiber positions, what loss did the splicer report, and did the OTDR agree? A year later, when a tech is chasing a loss budget that doesn't add up, an undocumented splice becomes the prime suspect. This is the note that closes a splice for good.

Before you fire the splicer: capture the fault picture

The splice itself: what goes in the ticket

  1. Per-fiber splice loss readings. The fusion splicer's estimated loss for every splice, in dB — not an average, per fiber. Good fusion splices land at 0.05 dB or less; anything over 0.1 dB gets a re-fire.
  2. Re-fire count and cause. If a fiber took three fires to pass, say so and record why (bad cleave, contamination, arc calibration). A fiber that needed four fires is worth flagging for future attention.
  3. Sleeve and tray work. Splice sleeve type/length used, the tray position each splice was placed in, slack management (coil diameter kept above minimum bend radius), and confirmation the tray lid closed without pinching.
  4. Post-splice OTDR verification. Trace taken from the same span end at the same wavelength as the baseline, showing the splice event at the expected distance with the expected loss. This catches macro-bends from tray closures that the splicer reading never sees.
  5. End-to-end result. Link state after the repair (no-link cleared, light levels at both ends, BER/error counters clean for the acceptance window). Close on verified end-to-end results, never on "splice looks good."

A splice ticket note that closes cleanly

Splice repair: vault MH-12, FOSC 400 case SN F400-8841,
tray 2, positions 7-8. Fiber: C-241 tube 3 blue → C-242
tube 2 white. Fault: break at 1,842 m (OTDR 1310 nm,
baseline trace ot-dr-mh12-0840.sor on file).
Splice 1 (blue): 0.03 dB, single fire, 60 mm sleeve.
Splice 2 (white): 0.04 dB, single fire, 60 mm sleeve.
Tray closed, slack coil ~76 mm radius, no pinching.
Post-splice OTDR 1310 nm: splice events at 1,842 m,
0.04/0.04 dB. End-to-end: no-link cleared 10:22,
RX levels -8.2/-8.5 dBm, error counters clean 15 min.
As-built updated: cable IDs C-241/C-242 sheet 4,
both fibers re-labeled in tray. Photos on file.

The mistakes that reopen splice tickets

Fiber notes like this pair with the universal floor workflow in the free RackReady sample. Related: fiber no-link checklist, bad optic escalation, escalation ticket guide.

See RackReady   Free sample   Ticket note examples

Support: support@hasherventures.com

Free tool: turn your splice checks into a structured ticket note with the RackReady Ticket Builder.